Section 38 Agreement Example

- April 12, 2021

The assumption is that the highway authority agrees to maintain the road at a public expense from an agreed date. The agreement between the motorway authority and the promoter is called the agreement section 38. Once a new road has been built to our standards under Section 38, it is generally publicly maintained. A Section 38 (or S38) agreement is a section of the 1980 Highway that can be used when a developer proposes the construction of a new road for residential, industrial or general transportation, which can be proposed to the road authority for adoption as a public highway. Section 38 of the agreements is often concluded at the same time as Section 278, which allows developers to carry out work on a public highway. This may be necessary. B to allow access to a new website or to improve access to an existing website. For more information, see Section 278. The section 38 agreement is legally binding. He says that when a developer builds a new road in Nottinghamshire, they make an agreement with us. This is part of Section 38 of Highway 1980.

Before entering into an agreement, the developer must have obtained the building permit, including permission for all reserved questions. The building permit will generally include an indicative ordinance of the roads to be adopted. Once an agreement has been reached in accordance with Section 38, the developer must work under a number of conditions, conditions and deadlines. It is supported by a loan or cash deposit, calculated by the motorway authority, on the basis of the proposed work. This loan or cash deposit can be used if the developer goes into liquidation or if he otherwise complies with his obligations. Public rights of way may be diverted or closed in favour of an alternative route and, for example, if public roads are unnecessary, they may be formally closed (arrested). Procedures are available under the Traffic Act and the Planning Act to make these changes, and the road engineer will play a role in the application process and establish the necessary documents. The Highway Authority (Council) does not have the power to insist that a developer enter into an S38 agreement. However, many developers consider this also the best option, as the adoption process can be long, and if it takes place at the end of a route, the developer is responsible for all maintenance work until the adoption takes place.

The procedure required to reach an agreement can take time and time, and it is therefore desirable to get in touch as soon as possible with the authority of the motorways. As a general rule, we will only process a Section 38 request for agreement when the plan has been established for “full or reserved issues.” The agreement provides for a levy covering the costs of the agreement; Project review, preparation of the agreement, inspection of work and routine maintenance of non-essential objects for motorway purposes (converted amounts). There may also be an obligation for the proponent to cover the motorway authority against the possibility that the proponent may not be able to properly complete the work, for example.B. if they become insolvent. Copies of the Section 38 agreements are available from the relevant regional authority of the Land. For agreements in Nottingham City, please contact Nottingham City Council. A Section 38 agreement is a section of The 1980 Highway that allows developers to enter into a legal agreement with the local highway authority to adopt and maintain new highway infrastructure at public expense. A developer may complete the construction of a road and then propose to the Highway Authority in accordance with Section 37 of the Highways Act 1980, but the S38 is more desirable because the Commission does not have the authority to insist that a road meet an authorized standard or that it is then proposed for adoption.

Discussion